Nueces River Authority; Wastewater Collection System Program, CID Projects #05, 06 & 07

  • 7.3 miles of gravity wastewater
  • 1.4 miles of sewer force main (including an HDD under the Frio River)
  • Two elevated sanitary sewer lift stations
  • Two at grade sanitary sewer lift stations
  • Two sanitary sewer grinder pump stations
  • 2.91 AC of effluent ponds, 31,100 CY of cut & 32,22 CY of fill, triple lined HDPE gemoembrane
  • 92 AC effluenet irrigation spray field, including 36-zones, 33,108 LF of 12″ to 4″ piping, 148 EA 75′ radii spray heads
  • CIP equalization structure
  • Vertical turban pump station and structure

Windmill Farms / Upper Windmill & Big Brush Sanitary Sewer Project

  • +/- 17,000 LF of 27″ to 12″ PVC gravity sanitary sewer
  • Cut depths up to 52′ deep.

Legacy Force Main South

  • +/- 10,000 LF of open-cut 20″ PVC sanitary sewer force main in the middle median of Panther Creek Pkwy. and Legacy Drive in Frisco, TX
  • Included a +/- 2,000 LF FPVC HDD with a compound curve under the intersection of Legacy Dr. and Eldorado Pkwy.
  • https://www.youtube.com/watch?v=lTDMdklPBQQ

Redbud Pump Station Transmission Waterline Phase 2

  • 4,400 LF of 42″ BWCCP (303)
  • 600 LF tunnel under Hwy. 75 in McKinney, TX

Upper and Lower Panther Creek WWTM

  • +/- 13,000 LF of 36″ to 18″ gravity sanitary sewer using FRP, PVC, and DIP.
  • 40+ Armorock manholes
  • 3 steel casing installations BOTOC under Preston Rd. and Eldorado Pkwy. in Frisco, TX
  • Cuts up to 38′ deep in mixed limestone and shale
  • +/- 76′ aerial crossing with a 40′ clear span in the center on four piers
  • Gabion baskets and gabion mattresses

Robinson Road 30/36″ Water Transmission Main

  • +/- 10,000 LF of 30/36″ BWCCP (303)
  • 8 steel cased crossing BOTOC with high groundwater
  • Sections of +/- 800′ intervals in length within narrow ROW
  • vibration monitoring
  • 36″ line stop installation on existing BWCCP
  • 24″ hot tap on existing BWCCP
  • 18″ hot tap on existing BWCCP
  • 8″ and 12″ CTE via. ring connection

Morriss Road Waterline Phase 2

  • +/- 4,800 LF of 30″, 24″ and 20″ DIP within the center median of Morriss Road in Flower Mound, TX
  • +/- 2,000 SY on concrete pavement replacement
  • 9 total connections to existing; sizes vary from 20″ down to 8″